• Home
  • Events Calendar
  • Blueprint Guidelines
  • Privacy Policy
  • Subscribe to Daily Newsletter
  • NextGenInfra.io
No Result
View All Result
Converge Digest
Saturday, April 11, 2026
  • Home
  • Events Calendar
  • Blueprint Guidelines
  • Privacy Policy
  • Subscribe to Daily Newsletter
  • NextGenInfra.io
No Result
View All Result
Converge Digest
No Result
View All Result

Home » Google Cloud region opens in Madrid in partnership with Telefónica

Google Cloud region opens in Madrid in partnership with Telefónica

May 25, 2022
in All
A A

Google opened a new cloud region in Madrid, Spain. 

The new Madrid region (europe-southwest1) provides low-latency, highly available cloud services with high international security and data protection standards. The Madrid region is launching with three cloud zones to prevent service interruptions, and our standard set of products, including Compute Engine, Google Kubernetes Engine, Cloud Storage, Persistent Disk, CloudSQL, and Cloud Identity.

The facility, which joins Google Cloud’s network of 33 regions throughout the globe, was built partnership with Telefónica.

“We welcome the Cloud capabilities that the Google Cloud region is bringing to Spain. It is especially important for the alignment with the security levels that public sector organizations demand and as required in the National Security Scheme. They must take advantage of a cloud that is offered locally with the highest security guarantees. The collaboration with hyperscalers is key. It is also essential to continue advancing with best practices adoption, training, security configurations and supervision” Luis Jimenez, Subdirector del Centro Criptológico Nacional.

https://cloud.google.com/blog/products/infrastructure/new-google-cloud-region-in-madrid-spain-now-open

Google’s Grace Hopper subsea cable lands in Cornwall

Wednesday, September 15, 2021  Google, Subsea, UK  

The Grace Hopper subsea cable has landed in Bude, Cornwall, UK. This follows a successful Bilbao landing earlier in September.

Google says Grace Hopper will use a new switching architecture to provide optimum levels of network flexibility and resilience to adjust to unforeseen failures or traffic patterns. 

https://blog.google/around-the-globe/google-europe/united-kingdom/our-grace-hopper-subsea-cable-has-landed-uk/?linkId=131609522

Google’s Grace Hopper subsea cable to link US-UK-Spain

Tuesday, July 28, 2020  Google, Subsea  

Google unveiled plans for a new subsea cable — Grace Hopper — which will run between the United States, the United Kingdom and Spain. The cable is named for computer science pioneer Grace Brewster Murray Hopper (1906–1992), an admiral in the U.S. Navy best known for her work in developing the COBOL programming language.

The Grace Hopper cable will be equipped with 16 fiber pairs (32 fibers). Subcom has been selected as the lead contractor. The project is expected to be completed in 2022.

Google said the Grace Hopper cable system will be the first to use a novel optical fiber switching that allows for increased reliability by moving traffic around outages.

Grace Hopper joins Google’s other private subsea cables, Curie, Dunant and Equiano.

Tags: Blueprint columnsData CentersGoogle CloudSpain
ShareTweetShare
Previous Post

Dell’Oro: Mobile Core and MEC market rebounds

Next Post

Nutanix reports sales of $403.7M, up 17%, and supply chain delays

Staff

Staff

Related Posts

iPronics Pushes Low-Power, Programmable Optical Switch
Optical

iPronics Pushes Low-Power, Programmable Optical Switch

November 5, 2025
Google Cloud Wins £400M UK MOD Sovereign Cloud Contract
Clouds and Carriers

Google Cloud Wins £400M UK MOD Sovereign Cloud Contract

September 14, 2025
Nokia launches Core Software-as-a-Service for 5G
Clouds and Carriers

Google Cloud CEO Thomas Kurian Details AI Infrastructure Leadership

September 14, 2025
Telefónica and Ericsson demo automated slicing in 5G Standalone
Legal / Regulatory

Telefónica Presses for Overhaul of EU Merger Guidelines to Reflect Dynamic Market Forces

July 18, 2025
Google to Build “Sol” Subsea Cable Linking Florida to Spain
Subsea

Google to Build “Sol” Subsea Cable Linking Florida to Spain

July 9, 2025
Madrid Internet Traffic Dropped 75% During Power Outage
All

Madrid Internet Traffic Dropped 75% During Power Outage

April 29, 2025
Next Post
Nutanix reports sales of $403.7M, up 17%, and supply chain delays

Nutanix reports sales of $403.7M, up 17%, and supply chain delays

Please login to join discussion

Categories

  • 5G / 6G / Wi-Fi
  • AI Infrastructure
  • All
  • Automotive Networking
  • Blueprints
  • Clouds and Carriers
  • Data Centers
  • Enterprise
  • Explainer
  • Feature
  • Financials
  • Last Mile / Middle Mile
  • Legal / Regulatory
  • Optical
  • Quantum
  • Research
  • Security
  • Semiconductors
  • Space
  • Start-ups
  • Subsea
  • Sustainability
  • Video
  • Webinars

Archives

Tags

5G All AT&T Australia AWS Blueprint columns BroadbandWireless Broadcom China Ciena Cisco Data Centers Dell'Oro Ericsson FCC Financial Financials Huawei Infinera Intel Japan Juniper Last Mile Last Mille LTE Mergers and Acquisitions Mobile NFV Nokia Optical Packet Systems PacketVoice People Regulatory Satellite SDN Service Providers Silicon Silicon Valley StandardsWatch Storage TTP UK Verizon Wi-Fi
Converge Digest

A private dossier for networking and telecoms

Follow Us

  • Home
  • Events Calendar
  • Blueprint Guidelines
  • Privacy Policy
  • Subscribe to Daily Newsletter
  • NextGenInfra.io

© 2025 Converge Digest - A private dossier for networking and telecoms.

No Result
View All Result
  • Home
  • Events Calendar
  • Blueprint Guidelines
  • Privacy Policy
  • Subscribe to Daily Newsletter
  • NextGenInfra.io

© 2025 Converge Digest - A private dossier for networking and telecoms.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.
Go to mobile version